REAC inspection and pre-REAC survey

Your score is decided before the inspector arrives

Survey before the visit, escort during it, appeal after it if the result does not match the property. The same team handles the repairs in between.

Call 610-200-2833
Property score Scale
0 / 100  Â·  benchmark
060 · pass mark100

Ninety is the benchmark. Sixty is the pass mark. Neither is the number that fails most borderline properties.

Try it

Build a property that passes, then fails it

Tick findings and watch the score move. Deductions depend on severity and on which inspectable area the defect sits in. Keep going until the unit meter crosses its limit.

Findings recorded

Readout
100
Pass
Unit area0 / 30

Under the 30-point limit

Inside area0 pts
Outside area0 pts
No findings recorded. A property with no deficiencies scores 100.

Weightings shown are illustrative and chosen to demonstrate the mechanic. HUD's published point values are set out in the final standards notice, and the real calculation depends on sample size and property configuration.

What a REAC inspection is

A physical assessment with a score attached

A REAC inspection is HUD's physical condition inspection of a property in a federal housing programme, carried out by or on behalf of the Real Estate Assessment Center and producing a score out of 100. Since October 2023 those inspections run under the NSPIRE protocol rather than UPCS.

People use "REAC inspection" and "NSPIRE inspection" interchangeably, and in practice they now describe the same visit. REAC is the office. NSPIRE is the protocol it applies.

Worth being precise about the score bands, because they are widely quoted and no longer describe what will happen. Under the legacy framework, 90 or above meant a longer gap before the next inspection and below 80 meant a shorter one. Under NSPIRE frequency is set by risk, so a high score helps your risk profile without buying a guaranteed three-year gap.

What has not changed is where points are lost. Severity and location drive deductions, set out item by item in the published standards. Corrections run through our repair services, and where the wider strategy needs attention, REAC consulting covers it.

Where the defect sits

The same defect, three different costs

Hover or tap an area to see it. Exterior work is visible, satisfying and comparatively cheap to point at. In-unit findings are none of those things and cost the most.

UnitHeaviest weighting

The sampled dwelling units. Alarms, outlets, heating, plumbing fixtures, appliances, floors, walls, ceilings, egress from the unit. Units are selected at random and carry more weight than anything else on the survey.

InsideShared exposure

Corridors, stairwells, lobbies, laundry, community rooms, mechanical and electrical rooms, and the building systems housed within them. Small failures accumulate quickly here.

OutsideLightest weighting

The building site, exterior components, and any systems located outside the building. Roofs, walls, walkways, drainage, lighting, fencing. Drainage problems here often explain damage found inside.

How deficiencies are graded

Four tiers, four clocks

Severity sets both the deduction and the deadline to correct it. Advice written for the old UPCS standards uses different terminology and points at the wrong priorities.

Life-threatening

Immediate risk to residents. Exposed conductors, blocked egress, gas leaks, missing or non-functioning alarms.

Correct in 24 hours

Severe

Significant defects affecting health, safety or the function of a building system, without the immediacy above.

Correct in 30 days

Moderate

Defects reducing the condition or usability of a unit, area or component without a direct safety risk.

Correct in 30 days

Low

Minor defects with limited impact on health, safety or function. Still recorded, still deducted, still worth clearing.

Correct in 60 days
Pre-REAC inspection findings and prioritised repair plan

Before and during

Pre-inspection, then escort on the day

A pre-REAC survey tells you what will be found while there is still time to act. More usefully, it tells you which findings are worth acting on. The difference between a heavy deduction and a trivial one is rarely obvious from looking at it.

On the day, an escort who knows the framework changes outcomes. Some findings are judgements about how a standard applies to a location, and those are far easier to resolve while the inspector is standing there than in writing three weeks later.

  • Survey scored the way the official visit will score
  • Findings separated by deduction, not by how they look
  • Unit-area exposure calculated on its own against the 30-point limit
  • Escort who knows when to question a finding and when not to
  • Notes taken on the day that can support an appeal

How to prepare

The constraint is repair time, not survey time

We can survey at short notice. What cannot be compressed is roof, structural and mechanical work, and that is what sets a sensible lead time.

120 → 60 days

The ideal window. Survey completed, findings ranked by deduction, and enough runway for envelope and mechanical work that needs procurement or a contractor schedule.

60 → 30 days

Still workable. Priorities narrow to the heaviest deductions and anything sitting in the unit sample. Cosmetic items get deferred deliberately rather than by accident.

Under 30 days

Triage. Life-threatening and severe findings first, unit-area exposure second. You get a written assessment of what fits, not an optimistic schedule.

Date already set

We can survey inside 24 hours. Call and we will tell you plainly what is achievable in the time that remains.

Where points go

Findings that cost the most

Weighting comes from the final standards notice and from where the defect sits, not from the size of the repair.

Life-threatening

Findings of this severity inside occupied units

Life-threatening

Smoke and carbon monoxide alarms missing or expired

Life-threatening

Exposed conductors and electrical panel defects

Life-threatening

Blocked or unusable egress

Life-threatening

Gas and sewage leaks

Severe

Non-functioning heating in season

Severe

Guardrails, handrails and fall exposure

Severe

Fire protection and sprinkler assemblies

Systems

Elevator faults and entrapment risk

Structure

Structural and foundation defects

Envelope

Roof assembly failure and water ingress

Site

Drainage and walkway condition

REAC inspection coverage across all 50 states

Appeals

Which findings are actually contestable

Appeals succeed on specific grounds, not on general disagreement. Conditions permitted by local code, matters demonstrably outside the owner's control, and work already documented as in progress are all legitimate bases for challenge.

We read the report against the evidence and tell you which findings meet that test before anything is filed. Filing on everything weakens the points that would have succeeded.

This is also why documentation matters during the visit rather than after it. An appeal is only as good as the record behind it, and that record has to be created while the inspector is on site.

REAC date set? The survey should come first.

Call 610-200-2833

Questions

REAC inspection FAQs

What is a REAC inspection?

HUD's physical condition inspection of a property in a federal housing programme, producing a score out of 100. The site, building, common areas and a random sample of units are examined against published standards, and every defect deducts according to severity and location.

Since October 2023 these inspections run under the NSPIRE protocol. REAC is the office that conducts them; NSPIRE is the standard applied.

How is a REAC inspection scored?

You start at 100 and lose points per defect, weighted by severity and by whether the defect sits in a unit, inside the building, or outside on the site. Below 60 is a failing score, and 30 or less is referred automatically for enforcement review.

There is a second condition people miss, and it is the one the simulator above demonstrates: lose 30 points or more in the unit area alone and the score is adjusted down to 59 regardless of how the rest of the property scored.

What counts as a good REAC score?

Sixty is the pass mark, and ninety or above has always been the benchmark for a well-run property. Under the legacy framework a score above ninety also bought a longer gap before the next inspection.

NSPIRE sets frequency by risk rather than by score band, so a strong score improves your risk profile without guaranteeing a three-year wait.

How far ahead should we prepare?

Sixty to a hundred and twenty days if you can, because the constraint is repair time rather than survey time. Roof, structural and mechanical work cannot be compressed.

We can survey inside 24 hours if your date is nearer, and we will be straight with you about what fits.

Is an appeal worth filing?

Only where the grounds are specific: a condition allowed by local code, something outside your control, or work documented as already under way. We will tell you which of your findings meet that test, and say so plainly when none of them do.

Scroll to Top
Free & no obligation

Get your property inspection-ready

Tell us what you're facing and our NSPIRE and REAC team will map out your next step.

How can we help?