Projects/Project 04
Apartment renovation: water-damaged bath to a finished unit
Behind an old tub surround the wall was stained and broken through. The bathroom was stripped back and rebuilt, and the unit was finished throughout.
- Category
- Maintenance
- Trade
- Apartment renovation
- Scope
- Bathroom rebuild and unit finish
- Bathroom
- Tub wall opened to the framing, new surround installed
- On record
- Photos and a walkthrough video
Condition found
What was behind the old tub surround
When the old surround panels came off, the wall behind them was dark with staining, the surface was coming away and there were holes below the window.
- Surround panels cracked and pulled away from the wall
- Wall surface stained and detached behind them
- Holes in the wall below the window
Before
Before
Before
The repair
Stripped to the framing, then closed back up
The damaged wall was taken out down to the framing and the old floor covering came up. A new tub surround then went in around the window, and the bathroom was put back together.
In progress
After
After
Walkthrough of the finished unit, 1 minute 15 seconds.
Result
A walkthrough of the finished unit
The video goes through the finished unit room by room: the entry, the living room, the kitchen, the bathroom and the closets.
What an NSPIRE inspector checks in a bathroom
A bathroom holds several inspected items in a small room. These are the three points that apply to this repair.
-
1
The wall surface is sound
An interior wall with a loose or detached surface covering is recorded as a deficiency.
-
2
The tub and shower are complete
A bathtub or shower component that is damaged, inoperable or missing is a deficiency.
-
3
The toilet is secure
A toilet that is not secured at the base is a deficiency.
Source: HUD NSPIRE standards, Wall - Interior, Bathtub and Shower, and Toilet.
Have a repair list that needs to be closed out?
Send it over. Consultations are usually scheduled within 24 hours.